Reliable and maintenance-free
SMART35 and Smart15 reclosers and Etalon switchgear are designed for reliable service. Fewer components mean fewer potential failure points.
Solutions for distribution substations
The Sub35 solution range for new construction, temporary power supply and substation refurbishment.
From grid connection to a 16 MVA distribution substation — solutions for 35/10 kV networks with overhead and cable lines.
Distribution substation requirements
SMART35 and Smart15 reclosers and Etalon switchgear are designed for reliable service. Fewer components mean fewer potential failure points.
Standardised assemblies, proven designs and a high degree of factory completion reduce engineering and on-site work.
The Smart platform provides protection, automation, revenue metering, self-diagnostics and data transmission to higher-level systems.
Standard configurations
35/10 kV · up to 4 MVA · grid connection
SOLUTION 0235/10 kV · up to 6.3 MVA · up to 10 feeders
SOLUTION 0335/10 kV · up to 16 MVA · overhead and cable lines
SOLUTION 0435/10 kV · up to 6.3 MVA · up to 8 feeders
A simplified single-transformer substation for connecting new loads where a supply point must be created on a minimal footprint.
A 35/10 kV substation based on SMART35 and Smart15 reclosers for new and refurbished distribution substations with overhead and cable connections on both 35 and 10 kV sides.
A 35/10 kV substation with indoor 10 kV switchgear in a modular building. The 35 kV side supports overhead and cable connections; the 10 kV side uses cables, with cable risers at the first pole of outgoing overhead feeders.
A 35/10 kV substation on a low-bed semi-trailer for temporary power supply without permanent construction. Deployment takes one shift.
Technical consultation
Answer a few questions to identify a suitable substation type. An engineer will confirm the final configuration after reviewing the initial data.
Solutions